40000 tons of Clinker Loaded Smoothly at Nigeria APAPA Clinker Export Terminal

Date:2020-06-18
Views:0

40000 tons of Clinker Loaded Smoothly at Nigeria APAPA Clinker Export Terminal

On the morning of June 11, 2020, 40,000 tons of clinker was loaded on board smoothly at the Nigeria APAPA Clinker Export Terminal of DANGOTE Group, which was contracted by Sinoma International (Nanjing) and constructed by Sinoma-Suzhou, it marking the whole project is successfully completed and is ready to start the performance test and handover.

APAPA Clinker Export Terminal is located in the hinterland of Lagos port and with unique geographical advantages, it is with excellent shipping conditions for large cargo shipping transportation. The successful operation of APAPA clinker export system become another successful model for the cooperation between SINOMA and DANGOTE Group besides the traditional cement production lines construction projects. It reflects the diversified construction strength of SINOMA, and help DANGOTE Group’s transformation and upgrading, open the road of globalization and diversification development.

40000 tons of Clinker Loaded Smoothly at Nigeria APAPA Clinker Export Terminal

40000 tons of Clinker Loaded Smoothly at Nigeria APAPA Clinker Export Terminal

 

NEWS

News